VanillaPM
Sign in Get started free Dashboard
Features

Everything a project needs.
In one place.

From the charter through closeout — WBS, scheduling with Earned Value, risk, budget, stakeholders, workforce, a governed knowledge base and AI assistance. Every module ships today and works with the others.

Task management that keeps everyone aligned.

Manage tasks across your entire project — assign owners, set priorities, track due dates, and filter by any combination of status, priority, or assignee.

  • Title, description, assignee, start & due dates, priority (Low → Critical), and WBS node linkage
  • Filter and sort by any field
  • Quick-edit modal — no page reload
  • Status: To do · In progress · In review · Done
Title Owner Status
Submit RFI to architectAHIn progress
Order cladding samplesRPTo do
Finalise cladding specJCIn review
Kick-off meeting with tradesAHDone

See your project's flow at a glance.

A visual board with four status columns. Move tasks between columns with a single click — status updates instantly via the API, no page reload.

  • Four columns: To do · In progress · In review · Done
  • Cards show title, priority badge, and assignee
  • Status updates in real time — no refresh
  • PM and Member can move; Viewer is read-only
To do3
Order cladding samples
LowAH
Confirm scaffolding lead time
HighJC
In progress2
Submit RFI to architect
HighAH
Done11
Kick-off meeting
MediumAH
Define initial WBS
HighAH

Schedule that does the maths for you.

A Gantt timeline over real dependencies, with the critical path computed for you, a saved baseline to measure against, and three-point/PERT estimation. For adaptive work, switch to sprints with velocity and burndown.

  • Task dependencies + critical-path method (float, critical tasks)
  • Schedule baseline, forecast finish, and schedule compression
  • Three-point/PERT estimation + resource leveling
  • Sprints, velocity & burndown for agile and hybrid
Task
W22W23W24W25W26W27W28W29
Site prep
Cladding install
Electrical 1st fix
Lobby fit-out
Handover

Risk, the way the standard means it.

Threats and opportunities, P×I scoring, and quantitative analysis — Expected Monetary Value rolls up to a recommended contingency reserve, and Monte Carlo gives you P50/P80 dates. A governed Risk Register document keeps it audit-ready.

  • Threat/opportunity, P×I score, category, response & fallback plans
  • EMV → contingency reserve · Monte Carlo simulation
  • Triggers, residual scoring & monitoring; assumptions promote to risks
  • A governed, printable Risk Register + Risk Management Plan
Late cladding delivery20
Schedule·P=4 × I=5
Subcontractor cost overrun12
Cost·P=3 × I=4
Permit revision required6
External·P=2 × I=3

Budget with Earned Value, not guesswork.

Cost per WBS node against a cost baseline, planned vs actual, and real Earned Value — CPI, SPI, variance and a forecast. Justify the project up front with cost-benefit analysis (NPV / ROI / payback), and handle multi-currency with a frozen FX snapshot.

  • Cost baseline · Earned Value (CPI/SPI) · variance & forecast
  • Cost-benefit analysis — NPV, ROI, payback
  • Multi-currency + frozen FX snapshot; fiscal quarter/year breakdown
  • Contingency reserve from risk (Σ EMV)
Planned
$148.5K
Actual
$92.1K
Variance
-$5.8K
MaterialCladding panels$42.1K / $48K
EquipmentScaffolding$19.4K / $18K
LabourElectrical 1st fix$24.5K / $26K

Structure your project before you build it.

The Work Breakdown Structure is the backbone of a PMBOK project — and here it's the backbone of the product. Decompose the work, import an existing WBS from Markdown or CSV, keep a dictionary and control accounts, and formally accept deliverables against it.

  • Requirements + traceability matrix; scope statement + scope plan
  • Bulk import (Markdown/CSV), WBS dictionary, control accounts
  • Tasks, risks and budget all link to nodes
  • Formal deliverable acceptance (Validate Scope)
1.0 Apollo — Phase 2
1.1 Site preparation
1.2 Building envelope
1.2.1 Scaffolding
1.2.2 Cladding install
1.3 MEP first fix
And the rest of the lifecycle

The modules other tools make you bolt on.

Stakeholders, people, quality, documents, governance and reporting — first-class here, not integrations you have to buy and wire up.

Stakeholders & comms

Power-interest and salience mapping, engagement level vs target with an interaction log, and a communications plan and schedule.

Organisation & workforce

An org-unit structure, staff directory, effort allocation across projects and operations, one capacity truth every schedule reads, and what-if scenarios.

Quality

Quality objectives and characteristics, measurements, cost of quality, and audits — connected to your deliverables, not a side spreadsheet.

Knowledge base

A governed charter and every management plan as living documents — versions, approvals, PDF/Word export, full-text search, diagrams, checklists, internal links, and offline reading.

Governance & change control

A governance plan, phase gates, integrated change control with an approved-change-to-tasks bridge, capability-based roles, and an append-only audit trail.

AI assistance

Bring your own key or use credits: draft documents section by section from your project data, and ask a conversational assistant that reads your project with your permissions.

The PMBOK-8 foundation

Organised around the standard — not bolted onto it.

VanillaPM maps to all five PMBOK 8th-edition process groups and its seven performance domains, and it teaches as it goes: a Guideline on every screen explains the practice, so the tool builds your competence, not just your project.

01 Initiating
02 Planning
03 Executing
04 Monitoring & Controlling
05 Closing

The whole lifecycle. Free to start.

One platform, no add-ons, no per-module upsells.